River works begin on new section of Shakujii River

Wind and flood damage

Tokyo is promoting the development of small and medium-sized rivers and streams to protect the lives and livelihoods of Tokyo residents from flood damage and to create moist and peaceful waterfronts.
We have received approval for urban planning work for the following section of the Shakujii River. In response, we will begin work on river improvement projects.
Going forward, we will proceed with design and other preparations for construction on the following sections.

1 About the Shakujii River

The Shakujii River is a first-class river that originates in Kodaira City in the central-northern part of Tokyo, flows almost in a straight line east through northern Tokyo, and joins the Sumida River in Kita Ward. Its drainage area is 73.1 square kilometers, and its length is 25.2 kilometers.

2 Overview of the project

In order to safely drain floodwaters caused by rainfall of 50 millimeters per hour, we will improve the river channel by widening the river width, etc., in order to reduce flood damage.

3 Business location

The new section to be worked on is approximately 390 meters from Sekimachi Kita 2-chome, Nerima Ward (upstream of Honryuji Bridge) to Sekimachi Kita 3-chome (downstream of Benten Bridge). *Attached guide map (PDF: 664KB)

4 Project period

The event is scheduled to run from June 30, 2025 to March 31, 2034.

This project is an initiative to promote the “Tokyo 2050 Strategy.
Strategy 21: Strengthening urban resilience “Strengthening measures against increasingly frequent and severe storm and flood disasters”

▲Tokyo 2050 Strategy
Contact:
Bureau of Construction, River Department, Planning Division
Phone: 03-5320-5414
Email: S0000384(at)section.metro.tokyo.jp
*The email address has been changed to prevent spam.
Please replace (at) with @ when using this email address.

その他のお知らせ

Search for news

Policies and plans are posted.

Category
Tag